Homepage | Home | Bookmarke
Member

Huangyan Jinzhuo Plastic and Mould Factory


Products
  • No Category
Search
 

Friends links
You are here: Home » Products » Disposable Plastic Thin Wall Bowl Round Mould
Disposable Plastic Thin Wall Bowl Round Mould
Click image to view full size image
Product: Views:443Disposable Plastic Thin Wall Bowl Round Mould 
Unit price: Negotiable
MOQ:
Quantity:
Delivery date: Since the payment date Days delivery
Valid until: Long-term effective
Last updated: 2019-07-20 04:28
  Inquiry
Details

Name

Description

Brand

JINZHUO

Cavity Number

single/multis or customer's requirement.

Mold Structure

1.Hot runner made by our own factory 

2.Self lock.

Design Software

PROE, Auto CAD, Solidwork, CAXA UG, CAM/CAE.

Surface Finish Process

Texture/Mirror polish or according to customer's request.

Lead Time

After drawing and deposit confirmed within 45 day.

Port

Ningbo port.

Trade Term

FOB ningbo


Mould Steel
1.cavity and core steel: Din1.2738 mould steel, made in Germany, with HRC 35-38.
2.inserts & slides steel:H13(DIN1.2344), tempered with HRC42-55, Nitrited with HRC60-65, measure up to D-M-E metric standard
3.mould spare parts:H13 ( DIN1.2344), tempered with HRC40-45, Nitrited with HRC60-62, measure up to D-M-E metric standard.

Packaging & Shipping
We can offer the complete package from concept to delivery; arranging everything up until the point your product arrives at your own door or distribution hub.
Packing Details: Wooden Box
Delivery Details: About 50 days after order
Mold Life: 3-5million shot times(the life depends on how to use it, proper use can prolong its life).


RFQ
Q: Are you trading company or manufacturer ?
A: We are factory with more than 20 years of experience. 

Q: What file format you can use of the drawings?
A: DWG, IGES, STP etc. which transferred from 3d software such as Solidworks etc.   

Q: What material is best for my product?
A: Material usage depends on the part and its function.We are happy to discuss the alternative material and suggest alternative materials. 

Q: I have a new project, but not sure if it can be manufactured. Can you help me? and what is the lead time of the mold?
A: Yes we always happy to work with our customer to make the idea come true,and usually it will take about 4 weeks to finish the mold.  
Welcome you to contact us to get some more details.Thank you very much!
High quality plastic injection thin wall lunch box mould/molding

Business Processing

1.Inquiry

Provide information, 2D/3D drawing or sample

2.Receive 3.Quotation

We provide it according to the information, 2D/3D drawing or sample

4.Discussion

Discuss mould core/base material, cavity number, runner type, price, payment, etc

5.Pay Deposit

50% by T/T

6.Receive trial 7.samples

We will express trial samples to customers by DHL/FEDEX/EMS for confirmation.

8.Feedback

We will modify the mould according to customer’s feedback

9.Mould approval

Express trial samples by DHL/FEDEX/EMS again till products approval

10.Balance

50% by T/T before delivery

12.Delivery

Delivery by sea or air, all documents as customer required.



http://www.thinwallmoldiml.com/

Inquiry